**Preventative Maintenance SOP
**Preventative Maintenance SOP
Steep-Slope Commercial Roofing Systems**
(RRSA-Aligned / Checklist-Driven)
1. Purpose
This SOP establishes a standardized preventative maintenance (PM) procedure for steep-slope commercial roofing systems. The goal is to ensure consistent inspections, accurate documentation, early issue identification, and long-term asset protection
2. Scope
This SOP applies to all steep-slope commercial roof systems, including:
-
Architectural & dimensional asphalt shingles
-
Metal shingles and panels
-
Tile, slate, and synthetic systems
-
All associated components:
-
Shingles
-
Underlayment
-
Flashings
-
Penetrations
-
Ventilation
-
Drip edge
-
Gutters and downspouts
-
3. Inspection Frequency
Per RRSA standards
-
Bi-annual inspections (minimum)
-
Post-severe weather inspections, including:
-
Hail
-
High wind events
-
Ice storms
-
Hurricanes / tropical systems
-
4. Safety & Access Requirements
Before any inspection:
-
Follow RRSA safety guidance:
-
PPE worn at all times
-
Secure ladder access
-
Avoid inspections during unsafe weather
-
-
Photograph:
-
Roof access points
-
Landscape and surroundings
-
Parking lot access for equipment planning
-
No inspection proceeds if conditions are unsafe.
5. Pre-Inspection Preparation
Inspectors must:
-
Review prior RRSA PM reports and SOP
-
Determine:
-
Roof type
-
Approximate age
-
Known issues
-
-
Prepare:
-
RRSA PM checklist
-
Drone (if approved)
-
Measurement tools
-
Notation method (digital or printed checklist)
-
6. Steep-Slope Roof Inspection Procedure
A. Shingles
-
☐ Check for missing field shingles
-
☐ Inspect for loose or lifted field shingles
-
☐ Check for missing hip and ridge shingles
-
☐ Determine manufacturer and approximate shingle age
Document:
-
Locations of deficiencies
-
Patterned vs. random damage
-
Signs of wind or hail impact
B. Underlayment & Protection
-
☐ Determine if Ice & Water Shield is installed at eaves
Note:
-
Visible underlayment exposure
-
Signs of moisture intrusion at eaves or valleys
C. Flashings & Penetrations
-
☐ Inspect all pipe flashings for deterioration
-
☐ Note pipe sizes and quantities
-
☐ Inspect water heater vent penetrations and flue caps
-
☐ Inspect solar stand penetrations if present
Check for:
-
Cracked boots
-
Sealant failure
-
Improper retrofits or fasteners
D. Ventilation
-
☐ Identify ventilation types (ridge, soffit, box, power)
-
☐ Determine if large round vents are static or powered
-
☐ Inspect kitchen and bath exhaust terminations
Confirm:
-
Proper termination
-
No blockage or back-drafting
-
No moisture staining
E. Drip Edge
-
☐ Note size and color of drip edge
Check:
-
Secure attachment
-
Proper integration with underlayment
-
Rust or corrosion
F. Gutters & Downspouts
-
☐ Inspect gutters for leaks, debris, and slope
-
☐ Note gutter sizes
-
☐ Identify leaf guards and type
-
☐ Inspect downspouts for clogs and secure attachment
-
☐ Note downspout sizes
Verify:
-
Proper drainage away from structure
-
No overflow staining or fascia damage
7. Preventative Maintenance Actions
During inspection, perform minor maintenance only if authorized:
-
Remove debris from roof, valleys, and gutters
-
Reseal minor flashing joints
-
Secure loose components
-
Tighten gutter fasteners
Repairs beyond minor maintenance are documented and escalated.
8. Documentation & Reporting
Per RRSA requirements
-
Take extensive photos:
-
Overall roof views
-
Close-ups of deficiencies
-
Access and landscape conditions
-
-
Compile findings into a formal report including:
-
Checklist results
-
Photo documentation
-
Measurements
-
Notes and observations
-
Reports submitted within 48 hours of inspection.
9. Post-Inspection Actions
-
Prioritize findings:
-
Immediate
-
Short-term
-
Monitor
-
-
Provide repair recommendations
-
Update property maintenance records
-
Schedule follow-up inspections or repairs as needed
10. Escalation Protocol
Immediately notify management if any of the following are identified:
-
Active leaks
-
Structural concerns
-
Storm damage
-
Safety hazards
-
Conditions that may impact warranties
11. Record Retention
Maintain all RRSA PM records for:
-
Roof system life
-
Warranty documentation
-
Insurance and asset management purposes
12. Sign-Off & Accountability
Inspection must be completed and signed per RRSA standards: